Turnkey Interior Fit-Out in Dubai, UAE — From Design to Handover
OP3 Global delivers complete interiorfit-out across Dubai and the wider UAE: corporate offices, medical clinics, showrooms, restaurants, retail and luxury residential. Design, authority approvals, MEP, joinery, construction and snagging all sit with one in-house team under one contract — so you have a single point of accountability from first drawing to the day you hand over the keys.
One Contract, One Team, One Point of Accountability
Fit-out projects rarely fail on design. They fail in the gaps — between the designer and the main contractor, between the contractor and the MEP sub contractor, between everyone and the authority whose approval nobody chased. Each handover is a place for a week to disappear. OP3 removes those handovers. Our designers, engineers, joinery workshop and site teams work under one roof in Dubai Industrial City, on one programme, answerable to one project manager. When adetail changes, it changes once and everyone builds to it.That structure is what lets us commit todates. It is also why our clients tend to come back for the second site.
Get the Portfolio⚙️ Our Process
2 - Concept design and 3D. Space plans, visualisations and a material palette, presented andwalked through. Typically 10 - 15 working days.
3 - Detailed design and costing. Technical drawings, MEP layouts, joinery details and a fullyitemised BOQ — no lump sums hiding scope.
4 - Authority submission and approval. We compile and submit the drawings package, respond to comments and secure permits. This is the stage that most often derails a programme; it isentirely ours to manage.
5 - Construction. Civil works, MEP first fix, joinery installation, finishes and second fix, run to a published programme with weekly progress reporting andsite photography.
6 - Snagging and handover. Joint inspection, defect close-out, testing and commissioning, as-built drawings, O&M manuals and warranty documents. Followed by a 12-month defects liability period.